Quality Validation

The following activities will occur to support the equipment installation:

  • Plant Steam System.
  • Pure Steam System.
  • Compressed Air Systems.
  • Instrument Air System.
  • Chilled Water System.
  • Heating Hot Water System.
  • Distilled Water System.
  • WFI System.
  • Air handling unit
  • Laminar Air Flow (LAF) unit.
  • Autoclave.
  • Parts Washer.
  • Heat Sealer
  • SCADA system to monitor environmental conditions (differential pressure, humidity, temperature) of room and HVAC controls.
  • D3 system to control cleaning recipes, including event archiving, data historian and batch reporting.
  • Fill @ Finish (Compact lines)
  • Serialization and Aggregation
  • Traceability Matrix
  • Reactors
  • Freezers
  • Hot Air Dryer
  • Tunnels
  • Warehouse Temperature Mapping
  • Clean Rooms and EMPQ

Building Management System

Manufacturing, Processing, and Packaging Development

  • Formulation Development
  • Pilot Batches
  • Process and Packaging Development 
  • Technical Technology Transfer (TTT)
  • Product Life-Cycle Management (PLCM)
  • Quality-by-Design (QbD)
  • Schematic Diagram
  • Submission Files
  • New Product Launch